Hose 1 819.0187-00 - Steel Wire Braided Rubber Hose Modèles compatibles: CS420
Sandvik · Pièces d'usure et de rechange pour concasseur à cône ISO 9001 Certifié · Approvisionnement Direct

Hose 1

Numéros de pièce OEM compatibles: 819.0187-00

Hose 1

Nuance matériau
Steel Wire Braided Rubber Hose
Poids
1.3 kg
Dureté
Shore A 70-90
Dimensions
Ø25×800 mm
Certification
ISO 9001:2015; CE
Délai de livraison
20 jours
Garantie
12 months from date of shipment

Modèle compatible

CS420

Application

Used in the hydraulic adjustment, overload protection and lubrication supply systems of the crusher, providing power and lubrication for discharge opening adjustment and tramp iron release

Notes d'installation

1. Before assembly, clean pipelines and valves with clean diesel; flush the system until acceptable before filling oil; 2. Confirm all connection fittings are tightened without leakage; 3. Bleed air throughout no-load operation, then gradually raise pressure to rated value

Questions fréquentes

How to troubleshoot insufficient hydraulic system pressure?
Troubleshoot in sequence: check tank oil level and quality, check whether the pump suction line is leaking air, measure pump output pressure (to judge internal leakage), check whether the relief valve is stuck or set too low, check whether the cylinder seals are leaking internally, then check whether pipeline fittings have external leakage.
How to handle hydraulic cylinder leakage?
External leakage: check the piston rod surface for scratches and replace the wiper seal and main seal; internal leakage: check whether the piston seals are aged or damaged and replace the complete seal set; pay attention to installation direction and lubrication when replacing seals to avoid lip reversal; run no-load to bleed air after assembly.
What are the replacement cycle and requirements for hydraulic oil?
Replace every 2000 working hours or annually under normal conditions, with the first oil change at 500 hours; use anti-wear hydraulic oil meeting equipment requirements (e.g., L-HM46); clean the oil tank and pipelines and replace the filter element when changing oil; filter new oil before filling (precision ≥10μm) and regularly test oil contamination level.

Formulaire de demande

Remplissez le formulaire ci-dessous et notre équipe vous répondra sous 24 heures avec un devis compétitif.

Hose 1 · 819.0187-00 · CS420
Demander un devis WhatsApp