Over Pressure Installation 452.6271-60/575 - ZG270-500 (Cast Steel) Model cocok: CH890
Sandvik · Suku cadang aus & suku cadang crusher kerucut ISO 9001 Bersertifikat · Pasokan Langsung

Over Pressure Installation

Nomor suku cadang OEM kompatibel: 452.6271-60/575

Over Pressure Installation

Grade material
ZG270-500 (Cast Steel)
Berat
75 kg
Kekerasan
HB 170-230
Dimensi
750×500×375 mm
Sertifikasi
ISO 9001:2015; CE
Waktu pengiriman
20 hari
Garansi
12 months from date of shipment

Model kompatibel

CH890

Aplikasi

Used in conjunction with the cone crusher to perform corresponding functions with the main machine, suitable for conventional crushing operations

Catatan pemasangan

1. Before installation, verify model, dimensions and drawings; 2. Work per the steps and torques specified in the installation manual; 3. During commissioning, monitor operating temperature, vibration and noise; stop and inspect immediately on abnormality

Pertanyaan Umum

What is the basis for selecting this part?
Select based on the equipment model, technical parameters and operating conditions, verifying mounting dimensions, connection method, material requirements and performance parameters; replacement parts must have equal or better technical specifications than the original, and critical parts require confirmation by the technical department before use.
What are the key points of daily inspection?
Check daily for appearance damage, secure connections and abnormal operation; weekly check that functions are normal and parameters are within range; monthly conduct in-depth inspection and maintenance; keep an equipment ledger recording inspections and repairs for traceability and predictive maintenance.
What are the storage requirements for spare parts?
Store in a dry, ventilated warehouse at 5-35°C with relative humidity ≤75%; avoid direct sunlight, corrosive gases and dust; precision parts must be kept in original packaging; shaft parts stored vertically or supported to prevent deformation; rubber and plastic parts kept away from heat sources and grease; conduct regular inventory checks, and parts beyond shelf life must be inspected and qualified before use.

Formulir penawaran

Isi formulir di bawah dan tim kami akan merespons dalam 24 jam dengan penawaran kompetitif.

Over Pressure Installation · 452.6271-60/575 · CH890
Minta penawaran WhatsApp