弹簧导套 53-367-366-500 - 60Si2Mn 适用机型: CJ409&JM907
Sandvik · 颚式破碎机配件 ISO 9001 认证 · 源头工厂直采

弹簧导套

替代 OEM 零件号: 53-367-366-500

弹簧导套

材质
60Si2Mn
重量
11.2 kg
硬度
HRC 45-50
尺寸
Ø60×45 mm
认证
ISO 9001:2015
交货周期
15 天
质保
12 months from date of shipment

适用机型

CJ409&JM907

应用场景

Used in the cushioning, vibration damping and tensioning system of the jaw crusher, absorbing impact and vibration during crushing, tensioning tie rods and belts, and reducing overall machine vibration and noise.

安装说明

1. Before installation, check springs/damping components for cracks, corrosion and permanent deformation; 2. Spring free height and pre-compression must meet design requirements with correct installation orientation; 3. After assembly, check tensioning force and damping clearance, and confirm no abnormal resonance during trial run.

常见问题

What problems occur when the tie rod tension spring becomes fatigued?
Spring fatigue shortens the free length and reduces force, causing the toggle plate and seat to separate, increased impact and vibration of the moving jaw, and easy fracture of toggle plate bolts. Measure the free length; when it is 5% below the drawing lower limit, replace the springs as a set.
Does a cracked rubber damping block need immediate replacement?
Fine surface crazing on damping blocks is normal aging, but if deep cracking, rubber-to-steel separation, or compression set exceeding 15% occurs, replace promptly; otherwise vibration will be transmitted directly to the foundation and frame.
How to determine whether the buffer (damper) has failed?
Observe the rebound after buffering: if it rebounds more than twice after one impact, or the damping rod leaks oil or sticks, the damper has failed. Replace with a same-model buffer to avoid machine resonance.